POSTED Tuesday April 16, 2024

Project: Big Sand Wash Cathodic Protection Retrofit Project

Owner: Duchesne County Water Conservancy District

Engineer: Bowen Collins & Associates

Description: The project includes installation of two deep well anode groundbeds and rectifiers, as well the installation of an insulating flange and galvanic groundbed.

Project Documents: 753-22-01 Big Sand Wash CP Retrofit

Planholders Sign Up Link: https://forms.gle/NBJN6AeARaGLjomA8

*Sign up on the plan holders list to receive project updates.

Virtual non-mandatory pre-bid meeting: Tuesday, April 23rd at 2 PM on Microsoft Teams (email for link)

Email project questions to Cameron Wasden: cwasden@bowencollins.com.

https://bowencollins-my.sharepoint.com/:f:/p/cwasden/EmUYX06Uat5Ep0hbMjgkhZ8BtVkwMtoqYwBo4U-LgxF6-w?e=sPtNc8

https://bowencollins-my.sharepoint.com/:f:/p/cwasden/EmUYX06Uat5Ep0hbMjgkhZ8BtVkwMtoqYwBo4U-LgxF6-w?e=sPtNc8

Victory Pipeline

The Victory Pipeline is being constructed in two phases and will bring water from the Duchesne Valley Water Treatment Plant on Starvation Reservoir and serve a number of water districts and municipalities. Phase I of the transmission pipeline is complete and drinking water is available for distribution to those entities within that service area. The culinary water project consisted of the installation of more than 86,000 linear ft. of pipeline ranging in size from 30 to 22 inches, along with 17 butterfly valve vaults, and 49 three to-eight inch diameter air or vacuum valves.

W.W. Clyde and Co was the general contractor and Jones and Demille Engineering was the engineering firm.

Victory Pipeline - Beginning

Beginning of Project

Victory Pipeline - Canal Crossing

Canal Crossing

Victory Pipeline - Pipe Laying

Pipe Laying

Atwood Lake Project